Collection
Collection
Learning
The group
Visit us
Expand child menu
Science Museum
National Science and Media Museum
Science and Industry Museum
National Railway Museum
Locomotion
Science and Innovation Park
Collection
Search
About
Search
About
Collection
Learning
The group
Visit us
Expand child menu
Science Museum
National Science and Media Museum
Science and Industry Museum
National Railway Museum
Locomotion
Science and Innovation Park
Bollard Piles for Wharf at Harbour Road
PART OF:
Gosport Wharf
part of archive:
Price & Reeves Archive
maker:
Price & Reeves
Details
Extent:
1 Drawing
Identifier:
P&R/7/8
Access:
. All requests for access to this collection should referred to the NRM Archives Manager for approval
Browse this archive
Price & Reeves Archive
P&R/1 Charing Cross, Euston & Hampstead Railway
P&R/1/1 Details of 12'-0" Net Tunnel
P&R/1/2 Type Drawing of Shield Chamber for Station Tunnels
P&R/1/3 Details of 25 Feet Iron Tunnel
P&R/1/4 Muck Stage at Belsize
P&R/1/5 Timbering for Shaft at Golders Green
P&R/1/6 Timbering for 27' Break-Up
P&R/1/7 Goodge Street Site, Timbering for Weighting in Shaft No. 2 while being Sunk with Cutting Edge
P&R/1/8 Oxford Street Station Booking Hall Level with Summary of Cost of Work to July 1906
P&R/1/9 25' 0" Shield Chamber Adelaide Site East Tunnel
P&R/1/10 Stereo Pairs
P&R/1/10/1 Footbridge across Tottenham Court Road Station [now Goodge Street]
P&R/1/10/2 Gas Mains Oxford Street Station [now Tottenham Court Road]
P&R/1/10/3 Concreting Station Platforms Tottenham Court Road station [now Goodge Street]
P&R/1/10/4 Passage at Cramborne [?] Street
P&R/1/10/5 Gas Mains at Oxford Street Station [now Tottenham Court Road]
P&R/1/10/6 Taking Out Iron for Footbridge at Tottenham Court Road [now Goodge Street]
P&R/1/10/7 Supporting Road at Oxford Street Station [now Tottenham Court Road]
P&R/1/10/8 Driving Passage for Footbridge over Station Tottenham Court Road [now Goodge Street]
P&R/1/10/9 Driving Passage for Footbridge over Station Tottenham Court Road [now Goodge Street]
P&R/1/10/10 Oxford Street Pit
P&R/1/10/11 Concreting Station Platforms Tottenham Court Road [now Goodge Street]
P&R/1/10/12 Concreting Station Platforms at Crambourne Street
P&R/1/10/13 Air Compressing Plant Crambourne Street
P&R/1/11 Progress Sheets
P&R/1/12 Charing Cross, Euston and Hampstead Railway 1908 Interlocking Timetable
P&R/1/13 Arrangements for Opening of the Charing Cross, Euston, & Hampstead Railway
P&R/2 London Electric Railway, Edgeware Road to Paddington
P&R/2/1 General Plan
P&R/2/2 Longitudinal Sections
P&R/2/3 11' - 8¼", 12' – 0" & 12' – 6" Dia[meter] Tunnels
P&R/2/4 15' – 0" & 16' – 0" Internal Dia[meter] Tunnel for Shield Chamber
P&R/2/5 21' - 2 ½" Int[ernal] Dia[meter] Tunnel for Stations
P&R/2/6 23' – 2 ½" Int[ernal] Dia[meter] C[ast] I[ron] Tunnel for Crossover
P&R/2/7 25' 0" Int[ernal] Dia[meter] C[ast] I[ron] Tunnel for Shield Chambers
P&R/2/8 27' 0" Int[ernal] Dia[meter] Tunnel for Shield Chambers
P&R/2/9 16' 0" Int[ernal] Dia[meter] C[ast] I[ron] Shaft
P&R/2/10 25" – 0" Int[ernal] Dia[meter] Shield Chamber
P&R/2/11 Station Platform, Permanent Way, Tiling Etc.
P&R/2/12 Station Headwalls and Cross Passage Between Running Tunnels
P&R/2/13 23' – 2 ½" Int[ernal] Dia[meter] Cross Over Tunnel and Headwall
P&R/2/14 8' 0" Int[ernal] Dia[meter] C[ast] I[ron] Tunnel
P&R/2/15 6' 0" Opening in Station Tunnel
P&R/3 London Electric Railway, Charing Cross to Kennington Extension
P&R/3/1 9' 0" 'Novelty' Heading, Cross Passages and Shield Chambers at Lambeth Road
P&R/3/2 Opening from 9' 0" 'Novelty' Heading into Shield Chambers at Kennington Park
P&R/3/3 Tunnels under Waterloo Station (Southern Railway)
P&R/3/4 9' 0" 'Novelty' Heading, Cross Passages and Shield Chambers at the Lion Brewery, Sutton Street, Waterloo
P&R/3/5 Opening from 9' 0" 'Novelty' Heading into 11' 8¼" Running Tunnel at Embankment Gardens
P&R/3/6 Step Plate Junction under Waterloo Station, Southern Railway, Plan
P&R/3/7 Step Plate Junction under Waterloo Station, Southern Railway, Section
P&R/3/8 Details of Crossing of Southbound Running Tunnel & Existing Loop Tunnel under the River Thames
P&R/3/9 Working Sites, Shafts and Service Headings
P&R/3/10 Plan of Running and Station Tunnels under Villiers Street, Embankment Gardens, Victoria Embankment and River Thames
P&R/3/11 Details of Junctions under Villiers Street and Embankment Wall
P&R/3/12 Details of 11' - 8¼" Shaft Shield
P&R/3/13 Step Plate Junction Between Tunnels at Kennington Station
P&R/3/14 C Sections of South Bound and North Bound Tunnels Sheet 1
P&R/3/15 C Sections of South Bound and North Bound Tunnels Sheet 2
P&R/3/16 C Sections of South Bound and North Bound Tunnels Sheet 3
P&R/3/17 C Sections of South Bound and North Bound Tunnels Sheet 4
P&R/3/18 11' – 8¼", 12' – 0" and 12' – 6" Int[ernal] Dia[meter] Cast Iron Tunnels
P&R/3/19 14' – 0" & 16' – 0" Int[ernal] Dia[meter] Tunnels
P&R/3/20 15' – 0" Int[ernal] Dia[meter] Cast Iron Tunnel
P&R/3/21 19' - 6" Int[ernal] Dia[meter] Cast Iron Tunnel
P&R/3/22 21' – 2½" Int[ernal] Dia[meter] Tunnel
P&R/3/23 23" – 2½" Int[ernal] Dia[meter] C[ast] I[ron] Tunnel
P&R/3/24 25' 0" Int[ernal] Dia[meter] Tunnel
P&R/3/25 27' – 0" Int[ernal] Dia[meter] Tunnel
P&R/3/26 Details of Opening at Bottom of 11' - 8¼" Working Shaft into 9' – 0" Novelty Heading
P&R/4 City and South London Railway, Morden Extension
P&R/4/1 General Plan
P&R/4/2 General Plan
P&R/4/3 General Plan
P&R/4/4 General Plan
P&R/4/5 Site for Nightingale Lane Station Showing Working Sites, Shafts and Headings
P&R/4/6 Site for Balham Station Showing Working Site, Shafts and Headings
P&R/4/7 Site for Trinity Road Station Showing Working Site, Shafts and Headings
P&R/4/8 Site for Tooting Broadway Station Showing Working Site, Shafts and Headings
P&R/4/9 Site for Collier's Wood Station Showing Working Site, Shafts and Headings
P&R/4/10 Site for South Wimbledon Station Showing Working Site, Shafts and Headings
P&R/4/11 Type details of Working Shafts, Headings, Shield Chambers etc. Contracts 1 & 2
P&R/4/12 11' - 8¼" Iron Tunnel
P&R/4/13 15' - 0" Dia[meter] Iron Tunnel
P&R/4/14 10' – 6" Dia[meter] Iron Linings
P&R/4/15 Details of Opening in 11' - 8¼" Tunnels
P&R/4/16 11' - 8¼" & 12' – 6" Dia[meter] Tunnels
P&R/4/17 13' - 1¾" Tunnel Lining
P&R/4/18 15' – 0" Dia[meter] Tunnel
P&R/4/19 21' - 2½" Dia[meter] Tunnel
P&R/4/20 4' - 6", 6' – 0" and 7' – 6" Openings in 21' - 2½" Station Tunnels
P&R/4/21 25' – 0" and 30' – 0" Tunnel Linings
P&R/4/22 Type Sections Showing Details of Concrete Supports and Decking for Permanent Way
P&R/4/23 General Sections, Contract Nos. 3 and 4
P&R/4/24 General Sections, Contract Nos. 3 and 4
P&R/4/25 General Sections, Contract Nos. 3 and 4
P&R/4/26 General Sections, Contract Nos. 3 and 4
P&R/4/27 Details of Tunnels and Heading
P&R/4/28 Details of Running Tunnels
P&R/4/29 Step Plate Junctions and Siding at Tooting Broadway
P&R/4/30 Details of Cross Passages between Station Tunnels
P&R/4/31 Cut and Cover Tunnels at Dorset Road
P&R/5 Other Underground Lines
P&R/5/1 Central London Railway, Sections 1, 2 and 3
P&R/5/2 Central London Railway, Nottinghill Gate Station
P&R/5/3 Underground Electric Railway Co of London Ltd Diagrams Showing Position of Car in Tunnel on 5 and 20 chain Curves with Table
P&R/5/4 Great Northern, Piccadilly and Brompton Railway Dover Street [Station], with Costings
P&R/5/5 Brompton & Piccadilly Circus Railway, C.L.R. Type, Concrete for Permanent Way for 25ft Tunnel
P&R/6 Other Railways
P&R/6/1 Barry Railway – East Dock, General Drawing of Tip Viaducts
P&R/6/2 Whitechapel & Bow Railway Progress Working, Plan & Section
P&R/6/3 Whitechapel & Bow Railway, Plan, Longitudinal Section and Cross Section Showing Method of Executing Cut and Cover and Supporting Tram Road
P&R/6/4 Whitechapel & Bow Railway, Cross Section of Tunnel Showing Method of Decking under Tramroad in Lengths at Cambridge Road, Stepney Green, Globe Road East, Burdett Road and between Burdett Road and Wellington Road Stations
P&R/6/5 Whitechapel & Bow Railway, Staging for Proposed Diversion of Great Eastern Railway Line at Archibald Street
P&R/7 Gosport Wharf
P&R/7/1 Gosport & Alverstoke Urban District Council Landing Stage, Wharf and other Works, Contract Drawings, 1 – 9: Sir John Wolfe Barry, Lyster & Partners, Engineers, Westminster
P&R/7/2 Main Piles
P&R/7/3 Reinforced Concrete Pile 30' Long
P&R/7/4 Sheet Piles 15½" x 8"
P&R/7/5 Sheet Pile Shoe
P&R/7/6 Sheet Piling for Harbour Section
P&R/7/7 Bearing Pile for Bridge 18" x 18"
P&R/7/8 Bollard Piles for Wharf at Harbour Road
P&R/7/9 Bollard Piles for Wharf at Harbour Road
P&R/7/10 Landing Stage and Wharf, Gosport
P&R/7/11 Landing Stage & Wharf, Details of Caping Reinforcement
P&R/7/12 Gosport & Alverstoke UDC, Details of Dolphins
P&R/7/13 Details of Piles
P&R/7/14 Gosport Landing Stage & Wharf, Cross Section Through Front Retaining Wall at Pile no 24
P&R/7/15 Gosport Landing Stage & Wharf Wharf at Harbour Road, South End Progress Drawing no. 3
P&R/7/16 Wharf at Harbour Road – North End Progress Drawing no. 4
P&R/7/17 Wharf at Harbour Road – North End Progress Drawing no. 4
P&R/7/18 Retaining Walls at the Hard Progress Drawing No. 8
P&R/8 Other Docks, Wharves and Drainage Schemes
P&R/8/1 Conditions of contract for HM Dockyard, Portsmouth Construction of Two First Class Docks to be Numbered Respectively 14 & 15 Director of Works, Admiralty
P&R/8/2 Portsmouth Dockyard, Proposed Dam at Entrance
P&R/8/3 Portsmouth Dockyard, Proposed Dam L Caisson
P&R/8/4 HM Dockyard, Chatham, Proposed Cofferdam for New Graving Dock Repairing Basin no. 1 Drawing No. 1
P&R/8/5 HM Dockyard, Chatham, Proposed Cofferdam for New Graving Dock Repairing Basin No. 1 Drawing No. 2
P&R/8/6 Thames Port Dock Company, Graving Dock No. 2
P&R/8/7 Keyham Dockyard Extension, Proposed Cofferdams
P&R/8/8 London Ocean Wharf, Ferro Concrete Construction (Hennebique system)
P&R/8/9 Birkenhead Corporation Water Alwen Supply Contract no. 3, Drawing No. 4, Tunnel under River Dee – Submerged Shaft
P&R/8/10 [Birkenhead Corporation Water Alwen Supply] Concrete Tunnels, Sewers, Culverts Etc. Patent Applied For, W S & J Robbins, Manchester
P&R/8/11 London County Council Main Drainage, River Graveney Improvement, Contract Drawings G W Humphreys, Chief Engineer
P&R/9 Rotherhithe Tunnel
P&R/9/1 Longitudinal Section on Centre Line of Tunnel
P&R/9/2 Proposed Vertical Air Locks M12
P&R/9/3 Sketch of Proposed Airlocks
P&R/9/4 Details of Shafts for Airlock
P&R/9/5 Steam and Exhaust Ranges for Engine and Boiler House
P&R/9/6 Elevation of Steel Bulkhead
P&R/9/7 Steel Bulkhead Sectional Plan
P&R/9/8 30' – 8" Dia[meter] Tunnelling Shield Details of Ironwork (Elevations)
P&R/9/9 30' – 8" Dia[meter] Tunnelling Shield Details of Ironwork (Plans)
P&R/9/10 Longitudinal Sections Showing Strata between Shafts nos. 1 & 2
P&R/9/11 Longitudinal Sections Showing Strata between Shafts Nos. 3 & 4
P&R/9/12 Progress Sheets
P&R/9/13 'A New Highway Tunnel under the Thames River at London, England' Engineering News vol. 58 no. 25 pp 663-684
P&R/9/14 'Rotherhithe Tunnel' by E.H. Tabor, Preprint from Minutes of Proceedings of Institution of Civil Engineers, 21pp, 2 plates
P&R/9/15 Stereo Pairs
P&R/9/15/1 No. 1 Shield under River Showing Erector
P&R/9/15/2 No. 1 Shield Showing Erector Where Man had Finger Cut Off
P&R/9/15/3 Staircase at No. 3 Shaft
P&R/9/15/4 Dome at No. 2 Shaft
P&R/9/16 London County Council Rotherhithe Tunnel Contract Drawings
P&R/10 Mersey Tunnel
P&R/10/1 Plan Showing Position of Tunnel in River Bed
P&R/10/2 Plan of the City of Liverpool and the Parish of Birkenhead Showing the Limits of Deviation of the Mersey Tunnel
P&R/10/3 Plan of the City of Liverpool and the Parish of Birkenhead Showing the Limits of Deviation of the Mersey Tunnel
P&R/10/4 Ordnance Survey Map of Toxteth Park and River Mersey Showing Working Site for Mersey Tunnel
P&R/10/5 Mersey Tunnel Approximate Quantities in Shafts and Headings and Mersey Tunnel Contract No. 1 Works
P&R/11 Plant Used by Price & Reeves
P&R/11/1 Side Tip Wagon, Details of Wagonwork Etc. Rivett [?] Manchester Ship Canal Type
P&R/11/2 General Arrangement of 4½ Cubic Yard Side Tip Wagon (Ship Canal Rype), Ruston Procter & Co. Ltd.
P&R/11/3 Tunnelling Shield 13' – 2" [0"] Dia[meter] Arrangement Markham & Co. Ltd., Chesterfield
P&R/11/4 7' – 7" Dia[meter] Tunnelling Shield General Arrangement Markham & Co. Ltd., Chesterfield
P&R/11/5 22' – 10" Dia[meter] Shield General Arrangement Markham & Co. Ltd., Chesterfield
P&R/11/6 6' – 0" Dia[meter] Heading Machine General Arrangement Markham & Co. Ltd., Chesterfield
P&R/11/7 13' 0" Tunnelling Shield, Cutting Edge, Bulged Top Markham & Co. Ltd., Chesterfield
P&R/11/8 13' - 0" Tunnelling Shield, Excavator & Bulged Top Markham & Co. Ltd., Chesterfield
P&R/11/9 13' – 0" Tunnelling Shield, Excavator Markham & Co. Ltd., Chesterfield
P&R/11/10 5 Tons Electric Gantry Cranes [20ft Radius]
P&R/11/11 5 Tons Locomotive Steam Crane Thomas Smith & Son (Rodley) Ltd.
P&R/11/12 3 Tons Locomotive Steam Crane Thomas Smith & Son (Rodley) Ltd.
P&R/11/13 3 Tons Electric Locomotive rane Thomas Smith & Son (Rodley) Ltd.
P&R/11/14 3 Tons Standard Locomotive Steam Crane Thomas Smith & Son (Rodley) Ltd.
P&R/11/15 5 Tons Locomotive Steam Crane Thomas Smith & Son (Rodley) Ltd.
P&R/11/16 1 ¾ Tons Electric Winches General Arrangement Thomas Smith & Son (Rodley) Ltd.
P&R/11/17 16' – 0" x 5' 0" Horizontal Air Receivers Working Pressure 100 lbs/sq in Spencer Bonecourt Ltd, Hitchin
P&R/11/18 Arrangement of "Sentinel" Air Compressor Size 2A 'Sentinel' Alley MacClellan Ltd, Glasgow
P&R/11/19 Reavell Vertical Double-Acting Compressor with Plate Valves Reavell & Co Ltd, Ipswich
P&R/11/20 General Arrangement and Reference Sheet for No. 15 Crane Navvy Ruston Procter Ltd., Lincoln
P&R/12 Documents and Published Material
P&R/12/1 List of Contracts [of Price & Reeves]
P&R/12/2 Rough List [Prepared by Mr Barlow?] of Plans in his Possession
P&R/12/3 Plans of Proposed Channel Tunnel
P&R/12/4 Obituary Notices of John Price from Contractors' Journal 30 June 1913 and from an Unknown Publication
P&R/12/5 'The Great Blackwall Tunnel, A Wonder of Engineering Enterprise. Fully Described and Illustrated' By [London County Council] 31pp, illus. Printed by Friars Printing Association Ltd, London
P&R/12/6 'Channel Tunnel Reports by British and French Engineers: Papers on National Defence.' By General Sir William Butler, Major-General ,Sir Alfred E Turner and Sir Charles Campbell. 56pp