Rough notes on the cost of earthworks and buildings
- Made:
- 1864-10-28
A rough note giving a cost of the civil engineering works that would be required for the Mid Sussex line, dated 28th October 1864.
Details
- Extent:
-
1 item
- Identifier:
- HMP/1/8