The Channel Crossing: The Feasibility of Ventilating Lengths of Road Vehicle Tunnel up to 16,000 Metres.
- PART OF:
- Miscellaneous papers
- Made:
- 1966-1983
Satisfactory ventilation ca be achieved as demonstrated by using the Mont Blanc tunnel as a full-scale model. By A.L.L. Baker. Plus Fig. 1.
Details
- Extent:
-
7 pp.
- Identifier:
- ALLB/C/113
- Access:
- Open Access
- copyright:
-
More
Copies may be supplied in accordance with current copyright legislation and Science Museum Group terms and conditions