The Channel Crossing: The Feasibility of Ventilating Lengths of Road Vehicle Tunnel up to 16,000 Metres.

Satisfactory ventilation ca be achieved as demonstrated by using the Mont Blanc tunnel as a full-scale model. By A.L.L. Baker. Plus Fig. 1.

Details

Extent:
7 pp.
Identifier:
ALLB/C/113
Access:
Open Access

Browse this archive