Drawing, paper with linen backing, Proposed Tank Engine for the South Western Railway of Venezuela, drawing made at The Vulcan Foundry, Newton-le-Willows, 20 April 1888. Depicts a narrow gauge 0-6-2T locomotive. Stamped "Please return tracing if tender not accepted." Drawing no. 3534. Proposed Tank Engine for the South Western Railway of Venezuela
Drawings and plans for the Selby diversion of the East Coast Main Line opened in 1983. Includes; 12 bound portfolios of tendering engineering drawings for the Selby Coalfield Diversion of the East Coast Mainline circa 1977-1979, one set of plans submitted with the Act of Parliament for the line. The drawings include alignments of the railway, cross-sections and plans, diversions of roads and footpaths, archaeological sites, as well as detailed drawings of bridges, fences, hedges, drainage, telecommunications. Produced by Chief Civil Engineer's Department, British Rail Eastern Region, Hudson House, York. Selby Diversion Drawings
Volume, paper with board covers, rebound and re-covered, GER Carriage Stock - Thirds, written up circa 1902, entries backdated to 1875, with amendments made up to circa 1956. Details GER third class carriages, their numbers, drawing and diagram references, compartments, suburban or main service, dates of modifications, dates of disposal. First of two volumes listing third class carriages. GER Carriage Stock - Thirds