Addy, Harry

Made:
2000-09-18 in Langtoft

apprentice fitter; fitter; yard engineer; marshalling yards; breakdown crane driver; track clearance; apprentice fitter; Staveley Motive Power Depot; fitter, smokebox jobs; inspecting engines, maintenance; Second World War; breakdown work, conditions (pay); Yard Engineer (Outdoor Machinery), Tinsley; automatic marshalling yard; driving breakdown crane, stoking; relations with other staff; Wood Walton derailment; method of clearing a track; relieving bogeys; breakdown crane capacity; conditions (hours, food); maintenance of breakdown crane, steaming, marshalling; trapped crash victims; risk; cutting gear; packing; outriggers; d.o.b. 1921-05-06, railway work 1937-1983, Barrow Hill; Darnall Motive Power Depot; Stavely; King's Cross; Peterborough; London North Eastern Railway (LNER). 3.1496 x 2.8346 x .315 in.

Details

Category:
Oral Histories
Collection:
National Archive of Railway Oral History
Object Number:
NAROH2000-61
Materials:
plastic (unidentified)
Measurements:
overall: 80 x 72 x 8 mm
type:
recording
credit:
Friends of the National Railway Museum