Print: Thames Tunnel Rotherhithe Entrance
- PART OF:
- Thames Tunnel
Print: Thames Tunnel Rotherhithe Entrance. / (Opened the 25th Day of March 1843). (1200 feet long, 76 feet below high water mark was 8 years building [from resumption in 1835] & cost £446,000) Engraved and Published by T.H. Ellis, 2 Jewin St London. 28x36cm