Engineering plan for Tower Bridge showing alteration of levels of northern approach
Engineering plan for Tower Bridge showing alteration of levels of northern approach, index number 1428, scale 20 feet to 1 inch, emanating from the office of John Wolfe Barry , date unknown
Details
- Category:
- Archive
- Object Number:
- 2015-460
- Materials:
- paper (fibre product)
- Measurements:
-
Unfolded - H=580
W1550=mm, Folded - H=320
W151=mm
- type:
- drawings
- credit:
- Museum Purchase