Engineering plan for Tower Bridge showing Alterations to stairs above roadway arch
- Made:
- 1893
Engineering plan for Tower Bridge showing Alterations to stairs above roadway arch, Index number 3226, emanating from the office of John Wolfe Barry, 15 Aug 1893
Details
- Category:
- Archive
- Object Number:
- 2015-469
- Materials:
- paper (fibre product)
- Measurements:
-
Unfolded - H=670
W=605mm
- type:
- drawings
- credit:
- Museum Purchase