Memorandum No. 64/1A produced by the Large Steam Turbine Engineering Department, Development Section. Concerns the Performance of the 500 MW Feedheating and Condensing Cycle By G.W. Brown and P.H. Brazier. Memorandum on the Performance of the 500 MW Feedheating and Condensing Cycle By G.W. Brown and P.H. Brazier.
Departmental Engineering Report D.E.R. 101/63/4 from Associated Electrical Industries Limited. - Turbine-Generator Division. The report was produced following a visit to General Electric Co. Schenectady, U.S.A by A. Sidebotham and P.H. Brazier in May 1963. This visit to G.E. was one of a series of routine visits, aimed at covering the whole field of the methods and experience of the design and layout of large steam turbines. Departmental Engineering Report D.E.R. 101/63/4 for a visit to General Electric Co. Schenectady by A. Sidebotham and P.H. Brazier.