General Electric Company Limited Applied Electronics Laboratories
Related Documents
Report entitled 'The Effect of Certain Parameters on the Beam Riding Performance of Seaslug Mark 2 in the Constant Angle of Sight with Terminal Dive Mode'
Report entitled 'The Seaslug Mark 2 Gathering Performance Study: Part 3 - Variations in the End-of-Gathering Velocity in the Constant Angle of Sight with Terminal Dive Mode'
Memorandum entitled 'An investigation into the obliquity of the 901 guiding beam axes observed in missile firings'
Report entitled 'The Effect of Candling During the Sustainer Motor Thrust Decay Period on the Reception of Commands'
Specification entitled 'Acceptance schedule for Seaslug missile test equipment Mark 2 (Depot)'
Report entitled 'A Compendium of Master Curves Relating to the Simulation of 901 RADAR Signals on the Neptune Computer'
Report entitled 'The Effects of Flame Attenuation on the Command System of Seaslug Mark 2'
Report entitled 'Specification No. MTE2/213 for the Production Testing of Board No. 213 Modulator, Time 4935-99-102-7246 Forming Part of Seaslug Missile Test Equipment Mark 2'
Report entitled 'Specification No. MTE 2/1039 for Testing Seaslug MK.2 Missiles and Spare Parts at R.N. Armament Depots'
Specification entitled 'Specification for testing Seaslug Mk.2 missiles and spare parts at RNADs, Parts 2 and 3'
See more related documents
- Report entitled 'Potential Improvements in the Low Angle Performance of Seaslug by the use of Frequency Jumping'
- Report entitled 'The Effect of Certain Parameters on the Beam Riding Performance of Seaslug Mark 2 in the Constant Angle of Sight with Terminal Dive Mode'
- Report entitled 'The Seaslug Mark 2 Gathering Performance Study: Part 3 - Variations in the End-of-Gathering Velocity in the Constant Angle of Sight with Terminal Dive Mode'
- Memorandum entitled 'An investigation into the obliquity of the 901 guiding beam axes observed in missile firings'
- Report entitled 'The Effect of Candling During the Sustainer Motor Thrust Decay Period on the Reception of Commands'
- Specification entitled 'Acceptance schedule for Seaslug missile test equipment Mark 2 (Depot)'
- Report entitled 'A Compendium of Master Curves Relating to the Simulation of 901 RADAR Signals on the Neptune Computer'
- Report entitled 'The Effects of Flame Attenuation on the Command System of Seaslug Mark 2'
- Report entitled 'Specification No. MTE2/213 for the Production Testing of Board No. 213 Modulator, Time 4935-99-102-7246 Forming Part of Seaslug Missile Test Equipment Mark 2'
- Report entitled 'Specification No. MTE 2/1039 for Testing Seaslug MK.2 Missiles and Spare Parts at R.N. Armament Depots'
- Specification entitled 'Specification for testing Seaslug Mk.2 missiles and spare parts at RNADs, Parts 2 and 3'