Isle of Wight Railway 1864 - 1921

Opened in 1864. It had a total length of 14.5 miles from Ryde to Ventnor and a branch line from Brading to Bembridge. The headquarters were at Sandown. It was taken over by Southern Railway, along with all other Isle of Wight railways under the 1921 Railways Act.