Design Minutes and Planning

Notes, minutes and correspondence relating to the planning of the Dry Bar 201 site. Includes obtaining consent and organisation of the demolition and re-fitting project, minutes of site meetings with Irwins building contractors and final preparations for opening including snagging lists. Includes a copy report on building works required at the site, by John Reid.

Details

Identifier:
YA1999.16/1/6/1/2/1
Access:
Open access.

Browse this archive