Drawing of The Birmingham Railway Carriage & Wagon Co. Ltd., Smethwick Pullman Cars Proposed Arrangement of Steam Inlet and Drain Pipes at Corridor Heater

PART OF:
Engineering Drawings of the Pullman Car Company
Made:
1950-02-14
part of archive:
Engineering Drawings of the Pullman Car Company
maker:
Pullman Car Company

Drawing No. SketchA

Details

Extent:
1 item
Identifier:
PUL/SketchA

Browse this archive