Photo showing Main sub-station. Cooling Tower. High speed laboratory & vertical spinning tunnel. 1000 ton testing machine entitled Fixing timber baffles inside cooling tower stack.

Details

Extent:
1 item
Identifier:
NAE/L/071
Access:
Open Access
System of Arrangement:
Show
Page number 37
rights:
Copies may be supplied in accordance with current copyright legislation and Science Museum Group terms and conditions

Browse this archive