Reinforced concrete foundation from the 1909 "Hennebique System"
- Made:
- before 1909
Reinforced concrete foundation from the 1909 "Hennebique System", Michelin Building, Fulham Road, London. The Michelin Building, commissioned by the Michelin Tyre Company Ltd. as their first permanent British headquarters in 1909, opened in 1911. In 1985 Michelin moved out of the building and it was bought by Sir Terence Conran and Paul Hamlyn for a restaurant.
Details
- Category:
- Building Construction
- Object Number:
- 1986-1478
- Measurements:
-
Overall: 1300 mm x 1230 mm x 1295 mm,
- credit:
- Bovis Construction Ltd.