Cribbens, Alan Hugh

Made:
2002-06-18 in Interviewer's home

British Rail research department; continuous communication with trains; line obstacle detection; advanced train control projects; Signal Repeating Automatic Warning System (SRAWS); Solid State Interlocking system (SSI); signalling and telegraph liaison; linking token instruments with a radio network; Radio Electronic Token Block (RETB); Integrated Electronic Control Centre (IECC); leaves on the line; safety; d.o.b. 1942-11-01, railway work: 1970-1997, University College London; General Electrical Company; General Signal Ltd; Westinghouse Signal Companies; Belgian Railways; Inverness-Wick; Leamington Spa; Dorchester; York; London Liverpool Street; West Highland line, Oban-Glasgow; Wales; Matlock;

Details

Category:
Oral Histories
Collection:
National Archive of Railway Oral History
Object Number:
NAROH2002-89
Materials:
plastic (unidentified)
Measurements:
: 72 x 80 x 8 mm
type:
oral history recording
credit:
Friends of the National Railway Museum