Cribbens, Alan Hugh
- Made:
- 2002-06-18 in Interviewer's home
British Rail research department; continuous communication with trains; line obstacle detection; advanced train control projects; Signal Repeating Automatic Warning System (SRAWS); Solid State Interlocking system (SSI); signalling and telegraph liaison; linking token instruments with a radio network; Radio Electronic Token Block (RETB); Integrated Electronic Control Centre (IECC); leaves on the line; safety; d.o.b. 1942-11-01, railway work: 1970-1997, University College London; General Electrical Company; General Signal Ltd; Westinghouse Signal Companies; Belgian Railways; Inverness-Wick; Leamington Spa; Dorchester; York; London Liverpool Street; West Highland line, Oban-Glasgow; Wales; Matlock;
Details
- Category:
- Oral Histories
- Collection:
- National Archive of Railway Oral History
- Object Number:
- NAROH2002-89
- Materials:
- plastic (unidentified)
- Measurements:
-
: 72 x 80 x 8 mm
- type:
- oral history recording
- credit:
- Friends of the National Railway Museum