Two reports concerning the assessment of factors affecting the continued life of 14 power stations with a proposed shut down date between 1962 and 1967. The second report is a follow on report looking at the possibility of cocooning, with complete de-staffing and keeping servicable identified power stations, for use at a later date, created by the Central Electricity Generating Board (CEGB) North West, Merseyside and North Wales Region Published Reports on Power Generating Stations
Scale: 1/8" to 1 ft Size: 77 x 133 Drawing entitled Active waste dump. Plans sections and elevations. General details.
Scale: 1/8" to 1ft Size: 75 x 132 Drawing entitled Developed elevation on pressure vessel wall of cable net and penetrations at 38' -6½" radius.
Scale: 1/4" to 1 ft Size: 77 x 133 Drawing entitled Turbine House. General arrangement of block for turbo-alternator No.1. Sht. 3 of 4.
Scale: 1/2" to 1 ft Size: 44 x 57 Drawing entitled Control block. Lift No. 5 motor room. Slung ladder to existing trap opening at 170.00 level.
Scale: 1/8" to 1 ft Size: 77 x 133 Drawing entitled Control block. Central change 34.5 level, toilet details.
Scale: 1/8" to 1 ft Size: 77 x 133 Drawing entitled Laundry-decontamination & active effluent treatment building.
Scale: �" to 1ft Size: 75 X 132 Drawing entitled Control building. Plan 34.50 level cent' change details of entrance hall & guardian glazing etc.
Scale: 1/4" to 1 ft Size: 77 x 133 Drawing entitled Welfare building, walkway between admin block and workshop.
Scale: 1/4" to 1 ft Size: 75 x 102 Drawing entitled Turbine house. General arrangement of block for turbo-alternator No.1. Sht. 1 of 4.
Scale: 1/4" to 1 ft Size: 77 x 133 Drawing entitled Turbine House. General arrangement of block for turbo-alternator No.1. Sht. 2 of 4.
Scale: 1/4" to 1 ft Size: 75 x 102 Drawing entitled General arrangement of pressure vessel cross-section showing envelope of helical cables.
Scale: 1/2" to 1 ft Size: 77 x 133 Drawing entitled Reactor control block. Details of lift No. 5 at 34.50 level to 170.00 level.
Scale: 1/8" to 1 ft Size: 75 x 102 Drawing entitled G.A. of unit and auxiliary transformer compounds between T/H and reactors.
Scale: 1/4" to 1 ft Size: 67 x 105 Drawing entitled Pumphouse. General arrangement of switchgear control room
Scale: 1/8" to 1 ft Size: 77 x 133 Drawing entitled Access bridge. Details of bridge and junctions with Turbine House and Reactor building.
Scale: 1/8" to 1ft Size: 75 X 132 Drawing entitled Laundry-decontamination & active effluent treatment building.
Scale: 1/8" to 1 ft Size: 77 x 133 Drawing entitled Welfare building. Plans at 34.50 level and roof level.