Image
Category
Object type
Material
Maker
Place
Archive
Date
Cottam Power Station control desk and equipment

Cottam Power Station control desk and equipment

1968

Three-dimensional Model of Electricity Consumption in Manchester

Three-dimensional Model of Electricity Consumption in Manchester

1954-1955

Set of 20 wall charts 'Famous Scientist'

Set of 20 wall charts 'Famous Scientist'

1950-1980

Hinton Cup Good Housekeeping Photo Album

Hinton Cup Good Housekeeping Photo Album

1989

Colour publicity brochure providing information about the building and operating of the power station which was situated on the bank of the River Irwell.

Publication - Agecroft Power Station

Publication by Central Electricity Generating Board titled 'Grain Power Station'.

Publication titled 'Grain Power Station'.

0.2 linear metres

Papers Relating to the Central Electricity Generating Board

1 file containing 8 items

Photographs, Manuals and Brochures for GEC Electric Locomotives

1 item

Photo album of Cottam Power Station detail site photographs

1 item

Photo album of Cottam Power Station Site Photographs

1 item

Photo album of Cottam Power Station

1 item

Photo album of Cottam Power Station Site Photographs

1 item

Photo album of Cottam Power Station site photographs

1 item

Photo album of Cottam Power Station site photographs

2 items

Central Electricity Generating Board Maps

897.00

Map - Central Electricity Generating Divisions

Scale: 1/16" to 1 ft Size: 50 X 75

Drawing entitled Layout of iron acton 132Kv termination.

Scale: 1/4" to 1 ft Size: 77 x 133

Drawing entitled Gatehouse. Screen wall details.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Welfare Workshops. Sections.

Scale: 1/2" to 1 ft Size: 77 x 133

Drawing entitled Reactor control block. Details of lift No. 5 at 34.50 level to 170.00 level.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Control block. Central change 34.5 level, toilet details.

Scale: 1/4" to 1 ft Size: 67 x 105

Drawing entitled Pumphouse. General arrangement of switchgear control room

Scale: 1/4" to 1 ft Size: 75 x 102

Drawing entitled General arrangement of pressure vessel cross-section showing envelope of helical cables.

Scale: 1/2" to 1 ft Size: 75 x 102

Drawing entitled Sewage disposal works, sheet 2.

Scale: 1/8" to 1ft Size: 75 x 132

Drawing entitled Developed elevation on pressure vessel wall of cable net and penetrations at 38' -6½" radius.

Scale: 1/4" to 1 ft Size: 77 x 133

Drawing entitled CO2 store. General Arrangements.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Access bridge. Details of bridge and junctions with Turbine House and Reactor building.

Scale: 1/2" to 1 ft Size: 77 x 133

Drawing entitled Reactors sections lift No. 9.

Scale: 1/4" to 1 ft Size: 77 x 133

Drawing entitled Turbine House. General arrangement of block for turbo-alternator No.1. Sht. 3 of 4.

Scale: 1/4" to 1 ft Size: 75 x 102

Drawing entitled Turbine house. General arrangement of block for turbo-alternator No.1. Sht. 1 of 4.

Scale: 1/2" to 1 ft Size: 77 x 111

Drawing entitled Sewage disposal works

Scale: 1/4" to 1 ft Size: 77 x 133

Drawing entitled Turbine House. General arrangement of block for turbo-alternator No.1. Sht. 2 of 4.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Administration building. Elevations & sections.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Administration building. Elevations & sections.

Scale: 1/8" to 1 ft Size: 75 x 102

Drawing entitled Layout of cables in bottom slab.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled 132 KV Switch house elevations and sections.

Scale: None Size: 75 x 102

Drawing entitled Isometric detail of block for turbo alternator No. 2.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Welfare building. Plans at 34.50 level and roof level.

Scale: 1/8" to 1 ft Size: 75 x 102

Drawing entitled G.A. of unit and auxiliary transformer compounds between T/H and reactors.

Scale: 1/2" to 1 ft Size: 44 x 57

Drawing entitled Control block. Lift No. 5 motor room. Slung ladder to existing trap opening at 170.00 level.

Scale: 1/32" to 1ft Size: 33 X 40

Drawing entitled Key to door notations 97.50'

Scale: 1/500 Size: 67 x 100

Drawing entitled Permanent site services sheet 1.

Scale: 1/16" to 1 ft Size: 75 x 102

Drawing entitled Layout of site services.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Active waste dump. Plans sections and elevations. General details.

Scale: 1/8" to 1ft Size: 75 X 132

Drawing entitled Laundry-decontamination & active effluent treatment building.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Laundry-decontamination & active effluent treatment building.

Scale: �" to 1ft Size: 75 X 132

Drawing entitled Control building. Plan 34.50 level cent' change details of entrance hall & guardian glazing etc.

Scale: 1/4" to 1 ft Size: 77 x 133

Drawing entitled Welfare building, walkway between admin block and workshop.

Scale: 1/8" to 1 ft Size: 77 x 133

Drawing entitled Turbine group. General elevations. 1/8" scale.

1 item

Booklet titled "Analysis of Generation Costs - 1983/84 Update"