Image
Archive
People
1 item

Specification entitled 'Procedure for the decontamination of T.P.2c gas generators on the B.Ae. automatic decontamination equipment'

1 item

Technical Note entitled 'A review of stress levels due to torque tightening of attachment bolts'

1 item

Specification entitled 'Instructions for Refurbishing the Candle Flame Extinguisher'

1 item

Specification entitled 'Handling Instructions for the Candle Flame Extinguisher'

1 item

Specification entitled 'Seaslug Mark 2 Sensing Unit Type No. C14525 Production Electrical Test Specification'

1 item

Specification entitled 'Seaslug Mk 2 Separation Switch and Cable Assembly (Telemetry Practice Version) Production Electrical Test Specification'

1 item

Specification entitled 'Calibration of the Restrictor Fluid Flow for the Candle Flame Extinguisher'

1 item

Report entitled 'R.N. Seaslug Mk 2 Service Firings Summary of missile performance'

1 item

Amendment entitled 'Amendment No 1 Seaslug Mk 2 - Continuation Firings Missile Analysis Report'

1 item

Report entitled 'Seaslug Mk. 2 Quarterly Financial and Technical Progress Report: Financial Year 1982/83 Third Quarter'

1 item

Report entitled 'Quaterly Return of Costs: Part 1 - Summary of Total Costs'

1 item

Report entitled 'Sesalug Mk 2 Ship Work-Up Firings Missile Analysis Report Round Numbers S2E 465 S2E 415 S2E 467'

1 item

Report entitled 'Seaslug Mk 2 Life Extension in Service with the Armada De Chile'

1 folder

Box file entitled 'Stevenage Site History'

1 item

Project information sheet entitled 'British Aerospace Involvement in Satellite Projects'

1 folder

Folder entitled 'Hubble Polar Platform Space Platform'

1 folder

Folder of photos

1 folder

Folder entitled 'HOTOL'

1 item

Paper entitled 'A Multirole Capsule Concept'

1 folder

Folder entitled 'GIOTTO'

1 item

Booklet entitled 'Pallet Family'

1 folder

Folder of press releases entitled 'Space Division'

2 items

Art work of Columbus satellite

1 folder

Folder of photographs entitled 'Launch Release Gear'

1 item

Technical Memo entitled 'Seaslug Mk. 2 Equipment Life Schedule'

1 item

Technical Memorandum entitled 'Seaslug Mk.2 Equipment Life Schedule'

1 item

Specification entitled 'Functional Test of the Inertia Release Gas Operated (I.R.G.O.) Valve Mk.2'

1 item

Specification entitled 'Functional Testing of the Candle Flame Extiinguisher'

1 item

Specification entitled 'Testing of Seaslug Mk 2 Break-Up System Wiring (Prior to Installation of K2A1 SAGW Unit) at RN Armament Depot'

1 item

Specification entitled 'Testing of Seaslug Mk 2 Break Up System on Board Ship'

1 item

Specification entitled 'Production Testing of Seaslug Mk 1 Simulator E2405 and E6275'

1 item

Specification entitled 'Assembly and Inspection Procedure for Gas Generator Cap-Igniter Terminal Assembly for Firing Harness Assembly C14529A'

1 item

Specification entitled 'Testing of Seaslug Mark 2 Telemetry Head'

1 item

Specification entitled 'Seaslug Mk 2 Separation Switch and Cable Assembly (Warhead Version) Production Electrical Test Specification'

1 item

Specification entitled 'Refurbishing of Deerhound centre body (Seaslug Mk.2)'

1 item

Report entitled 'R.N. Seaslug Mk.2 service firings summary of missile performance'

1 item

Report entitled 'Seaslug Mk. 2 Quarterly Financial and Technical Progress Report: Financial Year 1982/83 Second Quarter'

1 item

Report entitled 'R.N. Seaslug Mk.2 Service Firings Summary of Results'

1 item

Report entitled 'Seaslug Mk. 2 - Continuation Firing Missile Analysis Report'

1 item

Report entitled 'Seaslug Mk. 2 - Experimental Target Firings Trials Analysis Report'

1 item

Report entitled 'Seaslug development/cost plan, in service support (ISS) 1983/1984'

1 item

Report entitled 'Contract No. NCW121/1125 - Seaslug ISS - Quarterly Financial Return'

1 item

Report entitled 'Seaslug Mk. 2 - Continuation Firings Missile Analysis Report'