1 item Specification entitled 'Test and Assembly Sequence for Complete 'IRGO' Valve and Sustainer Motor Shuttered Igniter Gas Supply System, Including 'IRGO' Valve (Leak & Function Test)'
1 item Specification entitled 'Installation Pressure Test of Pipe and Valve Assembly to Drawing No. D.11198'
1 item Specification entitled 'Two-Axis Rate Gyro Unit Test Specification (Seaslug Mk 2 Boost Separation Improvement)'
1 item Specification entitled 'Seaslug Mark 2 Separation Switch Pack Production Electrical Test Specification'
1 item Specification entitled 'Seaslug Mark 2 Rectifier Unit Production Electrical Test Specification'
1 item Specification entitled 'Calibration of T.P.1.A. Gas Generator Control Valve to Drawing Nos B.18175'
1 item Specification entitled 'Functional testing of the TP2C gas generator safety vent valve, drawing no. B14080'
1 item Specification entitled 'Manufacture, Assembly, Test and Inspection of Bonding Leads on Missiles'
1 item Specification entitled 'Testing of Camera Power Unit B23584 Seaslug Mk. 2 Boost Improvement Programme'
1 item Report entitlted 'Synopsis of HSD's investigation into possible causes of S2D1 flight failure'
1 item Specification entitled 'Installation and Pneumatic Leak Test of Pipe Assemblies to Drawing No. D.11205'
1 item Report entitled 'A Method of Estimating Approximate Lethality Suitable for use in the Mk 2 Seaslug Overall Performance Study'
1 item Specification entitled 'Instructions for re-furbishing the T.P.I.A. gas generator, drawing no. E3300'
1 item Specification entitled 'Seaslug Mk.2 Transducer Assy Production Electrical Test Specification'
1 item Technical Proposal entitled 'Seaslug Mk. 1 Proposals for fuze re-optimisation and performance study'
1 item Specification entitled 'Seaslug Mk.2 transducer assembly, production electrical test specification'
1 item Technical Note entitled 'Seaslug Mk 2 A Retrospective Examination of the Look Angle and Time Delay Selected for the I.R. Fuze (Designated G.W.17) in 1962'
1 item Specification entitled 'Setting up, checking and maintenance procedures for the telemetry head test set, Type No E6073, and junction box D10748'
1 item Technical Note entitled 'I.P.N. Leakage Investigation on Seaslug Mk. 2 Gas Generator Serial No L.225 (Ref Service Defect Report CDA.4993)'
1 item Specification entitled 'Seaslug Mk.2 Accelerometer Electrical Linear D10593/3 Production Electrical Test Specificaiton'
1 item Specification entitled 'Seaslug Mk.2 Boost Arming Head - assembly requirements and electrical test procedure'
1 item Technical Note entitled 'IPN Leakage Investigation on Seaslug Mk. II Gas Generators using a Sieger Portable Explosive Gas Detector Model 608 Type 1'
1 item Report entitled 'Seaslug Mk.2 acceptance trials, final missile performance report, round no. S2D12'
1 item Specification entitled 'Seaslug Mark 2 Distribution Box D10570 Production Electrical Test Specification'
1 item Report entitled 'Seaslug Mk.2 acceptance trials, final missile performance report, missile no. S2D16'
1 item Specification entitled 'For the production testing of board no. 668 rectifier, semi-conductor device, forming part of Seaslug Missile Test Equipment Mark 2'