Image
Category
Maker
Object type
Material
Date
Description and rules for working of the automatic signals (Hall system) between Alne Station signal-box and Green Lane signal-box. 15 pages published by North Eastern Railway. Clean copy.

Train Signalling Regulations

Mar. 1906

Regulation for Train Signalling by Block Telegraph on double lines of railway, including an introductory letter. 79 pages published by North Eastern Railway. Clean copy.

Train Signalling Regulations

1906-04

Regulations for train signalling by Block Telegraph on double and single lines of railway. 15 pages published by North Eastern Railway.

Train Signalling Regulations

Sept. 1909

Single line working for Pilotmen. 8 pages published by North Eastern Railway.

Single line working for pilotmen

Aug. 1915

Appendix VII to Regulation for Train Signalling by Electric Block and Block System (Sykes') on double lines of railway. 24 pages.

Train Signalling Regulations

May 1908

Regulation for Train Signalling by Block Telegraph on double lines of railway, including an introductory letter. 80 pages published by North Eastern Railway. Clean copy.

Train Signalling Regulations

Sept. 1909

Special working regulations to be observed for working traffic over a line in the wrong direction, during repairs or obstruction, in cases where there are more than two running lines and when two or more lines , in one direction only, are left unobstructed. 37 pages, published by Great Northern Railway.

Special Workings

Special working regulations to be observed for working traffic over a line in the wrong direction, during repairs or obstruction, in cases where there are more than two running lines and when two or more lines , in one direction only, are left unobstructed. 37 pages, published by Great Northern Railway.

Special Workings

General regulation for working the Absolute Block Telegraph on double lines of railway. 91 pages, published by Great Northern Railway. Poor conditions.

Train Signalling Regulations

1911-04