Explanation for fixing an Additional Pump at the New Navy Well at Sheerness, with references to the accompanying Design/S Goodrich, Portsmouth Yard. [Bears line drawing with wash to 1/4":1' scale. With additional drawings and pencil sketches]

Details

Extent:
3p on 1 leaf + 4p on 3 leaves
Identifier:
GOOD/A/0725a
Access:
Open Access

Browse this archive