File relating to Torness Power Station Auto Control

Working documents of James Barry Schumm produced in the closing stages of the Torness Power Station group of contracts, in particular the Auto Control. It contains a mix of handwritten and printed documents comprising: site reports, diagrams, draft design information, meeting notes, fault reports and fault finding procedures OSC245 (P66425001 Issue 2, November 1984) along with correspondence between Ferranti, S.S.E.B. and N.N.C. The file was formerly attached by bulldog clip to the cover of a Ferranti branded lever arch file containing the items catalogued as 2023-585/1/1/2.

Details

Identifier:
2023-585/1/1/1
Access:
Open access

Browse this archive