File relating to the closing stages of Torness Power Station group of contracts

Working documents of James Barry Schumm produced in the closing stages of the Torness Power Station group of contracts. It includes a mix of handwritten and printed documents comprising: internal memos, design information bulletins, document appraisal responses, correspondence between Ferranti and CEGB, goods notes, draft meeting notes, monthly reports and design changes to the build schedule. The file was removed from a Ferranti branded lever arch file which also contained the items catalogued as 2023-585/1/1/1.

Details

Identifier:
2023-585/1/1/2
Access:
Open access

Browse this archive