Veevers, James Wannop

Made:
2001-01-10 in Dumfries

signalling and telegraph department; electrification; different signalling and control systems; telegraph office messenger; telegraph & electrical installation squad, Carlisle, Stranraer; telephone switchboard; duties, wages; telegraph lineman, Edinburgh; key token; Leclanche cells; intermediate block signal maintenance; Second World War; block controls installation; loyalites between CR and GSWR; Quintinshill incident; WCML electrification; single line working; pole route maintenance; Cairn Valley signalling system; area reorganisation; equipment; interlocking signals; resignalling, Dumfires, 1956; royal train duties, 1946-54; domestic life; seasonal jobs; tablet working equipment; maintenance; experience; different signalling systems; naming signal boxes; safety improvements; nationalisation; water troughs; track circuits; training, electrical signalling; tablet failure; maintenance and installation experience; motor operated points; weather problems; cables; automatic half-barrier installation; level crossing; electrification; WCML; staffing; Sykes signalling; long section working; block circuit; electrification; work study; maintenance; anecdotes; rules; anecdotes; redundancy; d.o.b. 1912-12, railway work 1927-1977, Scotland. 3.1496 x 2.8346 x .315 in.

Details

Category:
Oral Histories
Collection:
National Archive of Railway Oral History
Object Number:
NAROH2001-02
Materials:
plastic (unidentified)
Measurements:
overall: 80 x 72 x 8 mm
type:
recording
credit:
Friends of the National Railway Museum