U-matic S videotape ‘Duchess of Hamilton Locomotive Overhaul project’ tape 23 of 26

Made:
1990-04-13; 1990-06-21

Video footage taken on 13 April 1990, first public train run departing York. Also footage taken on 21 June 1990, boiler cladding work, tape 1 of 2. Filmed by Gavin Mist, sound recorded by Kenneth Mellor. Low band, unedited original camera tape. Colour, sound. Duration: 20 minutes maximum

This videotape is part of the a collection of video recordings commissioned by the Friends of the National Railway Museum in the 1980s and 1990s and made by John Spencer Gilks and Gavin Mist. The series of footage intended to be part of ‘FNRM Archive’, a video archive of railway operation at the time, with an emphasis on signalling (level crossings, signal boxes, semaphore signals), also capturing traffic and operations on specific lines prior to their closure. In addition, the series includes a complete record of the restauration work on the 'Duchess of Hamilton' 4-6-2 Coronation class, No 6229, between 1986 and 1990.

Details

Category:
Moving Images
Object Number:
2023-295
Materials:
plastic (unidentified), polyester and magnetic layer
Measurements:
overall: 200 mm x 130 mm x 30 mm,
type:
videotapes