Letter from Norman Ellis to William Grey Walter, 18 February 1946
Describes faults and ongoing delays with the production of the analyser equipment at Edison Swan.
Details
- Measurements:
-
252.00mm (height)203.00mm (width)
- Extent:
- 1 letter, 2 pages
- Identifier:
- BURD/A/02/33
- Access:
- Open Access
- rights:
- Copies may be supplied in accordance with current copyright legislation and Science Museum Group terms and conditions