Buy this image as a print 

Buy

License this image for commercial use at Science and Society Picture Library

License

Science Museum Group
© The Board of Trustees of the Science Museum

Details

Extent:
1 item
Identifier:
HEAD/73
Transcription:
[Page 136]

It was almost as hard as a road, but the 4 furrow plough went thro’ pretty well[.] We next tried the subsoil plough _ this was almost too much for the engine _ which had to run at its work _

I made sketches at the works, for a new scheme of my own for switching away the rope-porters, instead of having boys to remove them _ it was simply a rod of iron fastened to, & joining the taut & slack ropes.

Warby and I between us have hit on a capital joint for the wire-rope it is thus

[Sketch here]

[Page 137]

making a universal joint –

To-day I took a survey of the field we had operated upon, which was so hilly, & found the hollow was 27 ft deep

Fr[iday]. Xtmas day. I stayed at home and made a drawing of the field mentioned above, tracing ?? of which were distributed everywhere _

Afterwards went down to the works saw a model of Warbys’ [sic] to supersede Boydel[l], which he wanted me to perfect

Mary as usual made us presents, of pieces of her handy work all round & we gave her a workbox

Browse this archive