Letter from Harris Dickinson, Newcastle-upon-Tyne to Timothy Hackworth, Railway Office, Darlington

Made enquiry at Glebe Colliery and the boiler is ready; The Bedlington Iron Co. Repairing the main engine and has not managed to finish the wooden wheels; angle sleeves forwarded shortly; boiler for 'Swift' engine is going forward. Cannot find plan for boiler sealing of the 'Glebe' [Globe?] engine.

Details

Extent:
1 item
Identifier:
HACK/1/1/26

Browse this archive