June 7th 1833, Reports made to the Stockton & Darlington Railway Commettee by John Graham
Gentlemen,
We are very badly suplied with water at Darlington for the Locomotive Engines, which is causing the Pumping at the Black Boy Branch to be very expensive, and own to the eater at Bowsfield Lane not being good we are obliged to Pump A Great deal out of the Pond at Goos Pool which is Lowring very fast
The 34 waggons belonging the Company is now put into A good state of Repair and fit for sale
{ H.S. _ }
[Page 19]
June 14th 1833, Reports made to the Stockton and Darlington Railway Commettee by John Graham
South Durham Colliery is now don with the 20 waggons they have had for the last few weeks belonging to the Railway Company; do the Company think it write to get them Repaired and made fit for sale
{ Not to be repaired at present }
A Bell or Rapper is very much wanted at Brusselton East Bank and Black Boy North Bank as there is a sereous Loss of time at Both places _ { refered for reconsideration }