Pages 8 and 9 of John Graham's report book 1835-1838
Details
- Extent:
- 1 item
- Identifier:
- GRA/3/7
- Transcription:
-
Show
[Page 8]
Coach three times a day to St Helens
[Page 9]
May 1st 1835, Reports made to the Stockton & Darlington Railway Commettee by Jno Graham
April 29th
Brusselton west Bank Rope Broke with the Loading Waggons and Coach, the waggons wear stoped by the Cow so that no damage was done; A new Rope will want to be ordred for the above Plain 955 Fathoms 6½ Inch Rope, The Last Rope has been on nearly 10 months