Pages 77 and 78 of John Graham's report book 1833-1835
Details
- Extent:
- 1 item
- Identifier:
- GRA/2/41
- Transcription:
-
Show
[Page 77]
March 21st 1834, Reports made to the Stockton & Darlington Railway Commettee by John Graham
March 19; The Switch at the Depoes on the Black Boy South Bank was wedged wrong which through the Loading waggons off the way and Broke 1 wheel & 2 Soles
Damage about 2 £
March 20th As Mathew the Coach man was riding A waggon down Brusselton west Bank the Brake Came off and the waggon got A main down the Bank Damage about 1£ 16s
George Stephensons Contract for Leading the Coals from Tulleys weigh to Croft & Darlington Houghting Lane & Fighting Cocks
[Page 78]
will be out at the end of this Month dose the Company wish to take in Tenders for the above work or aggree with George Stephenson again
John Graham has taking in Tenders for the Finding of Oil for the waggons at Brusselton West Bank as follows Robt Richardson 1s”7d per Day George Hoare 1”4 per Day