Pages 155 and 156 of John Graham's report book 1833-1835
Details
- Extent:
- 1 item
- Identifier:
- GRA/2/80
- Transcription:
-
Show
[Page 155]
Out of the Coach at Aycliffe Lane, The Guard then got in beside her and conducted himselfe very improperly she beged that for the Safety of other Females the case might not pass unnoticed
{ To be settled by the Coach Committee FM }
[Page 156]
January 30th 1835 Reports made to the Stockton & Darlington Railway Commettee by John Graham
January 28th the Copper pipe belonging to the water Station at Shildon, was broke by the inattention of William Gill and Wm Ridman, Enginemen
{ Charge the damage JP. }
January 27th One of St Helens waggon wheels broke when desending with the Shildon Train near Meddrage Lane no further damage was done except one Sheth Broke